Skip to content

Shop Now

Aging in Place

Planning a Home for ALS

The one condition where planning ahead of need is not optional. What to put in early and why timing matters more than product choice.

ALS is the situation where our usual advice reverses. Everywhere else we say do the cheap things first and wait. Here, waiting costs function that will not come back.

We are not clinicians. An ALS clinic team should be leading this, and what follows is the equipment and building side.

Plan two steps ahead

Progression varies and is generally faster than families expect. Equipment ordered when it is needed frequently arrives after it is needed, and construction takes longer still.

So the planning question is not what is needed now. It is what will be needed in six months, and what has a lead time longer than that.

A curved stairlift takes weeks to manufacture. An elevator or a bathroom conversion takes months. A ceiling track needs structural work. Those are the decisions to make early.

Decide the ground floor question first

The single biggest decision, and the one that removes the most problems.

Reorganising to one floor, with a bedroom and an accessible bathroom on the ground level, sidesteps the staircase entirely rather than managing it through successive equipment purchases. Where the house allows it, it is usually the right answer and it is cheaper than the alternatives.

Our accessibility guide covers what that involves.

Ceiling track, early

The intervention that changes daily life most, and the one that needs building work.

A track between bed and bathroom, or bed and chair, turns transfers that will eventually need two people into transfers one person can do. Installing it before it is needed costs the same as installing it after, and removes a period of dangerous manual handling in between.

Where a room is being altered for any reason, add the structural provision even if the track comes later. Our patient lift guide covers the options, including portable systems for rented homes.

Seating and the wheelchair

This is complex rehab from the start rather than a retail purchase. Tilt, recline, head support, and alternative drive controls as hand function changes.

Specify for where things are going rather than where they are. A chair with tilt and the mounting provision for alternative controls can adapt; a basic chair cannot, and the process to replace it takes months.

Our seating guide and controls guide cover what each function does.

Communication and environmental control

Outside what we supply and too important to leave off.

Speech-generating devices, eye-gaze systems, and environmental controls that operate lights, doors, beds and phones from the same interface. An assistive technology professional through the clinic team leads this.

Voice banking, recording somebody’s voice while speech is still clear, is time-critical and frequently mentioned too late.

Doors

Automatic openers on the front door and any door used daily. For somebody who cannot manage a handle, this is the difference between independence and needing someone present.

They can frequently be integrated with an environmental control system, which is an argument for planning both together rather than separately.

Bathing

A roll-in shower with a rolling shower chair, or ceiling track into the bathroom. A transfer bench works for a period and stops working.

Given the lead time on construction, this is a decision to make before it is urgent. Our wet room guide covers the build.

The caregiver

The person doing the transfers is doing several a day, frequently at night, for months. Equipment that protects them is not secondary.

A gait belt early. Slide sheets. Then powered transfer before manual handling becomes unsafe rather than after. Our transfer aids guide covers the ladder.

Funding and timing

Medicare covers portable durable medical equipment rather than home modification. Medicaid waivers at Medicaid.gov frequently do cover modification, with waiting lists measured in months, which is the argument for applying early.

ALS-specific organizations run equipment loan programs, and for a condition where equipment is outgrown quickly, a loan closet is frequently better than a purchase. Our funding guide covers the routes.

Smaller equipment ships free from our online shop, and all consultations and written scopes are free of charge with no obligation.

Breathing equipment changes the room

Worth planning for early because it affects layout rather than only equipment.

Non-invasive ventilation, cough assist devices and suction all need power, space beside the bed and somewhere for a caregiver to stand. Plumbing or electrical work made necessary by home medical equipment is one of the purposes HISA covers for veterans, and our HISA guide sets out the program.

Ask the clinical team what equipment is likely, and design the bedroom around it before it arrives.

Bed choice

A profiling or hospital bed early rather than late. It changes positioning, breathing comfort and the ease of every transfer, and it is one of the few large items Medicare’s durable medical equipment category may cover.

Place it with access on both sides where the room allows. A bed against a wall makes two-person care impossible and one-person care harder.

Talk about the decisions early

Not our territory and it belongs on any honest page about ALS. Advance directives, a healthcare proxy, and a written statement of what somebody wants are easier to sort while communication is straightforward.

Our planning guide covers the documents, and the ALS clinic team will have done this many times.

Getting help sooner

Families take on more than they should for longer than they should. Respite, home care and hospice or palliative involvement are all easier to arrange before a crisis than during one.

Our in-home care guide covers what each type is and when to bring it in.

Order of operations

  1. Decide the ground-floor question, because everything else follows from it.
  2. Start any construction now: bathroom, ramping, ceiling track provision.
  3. Specify the chair for six months ahead, not today.
  4. Get the environmental control and communication assessment started.
  5. Protect the caregiver from the start rather than after an injury.

Nothing on that list gets cheaper or easier by waiting, and several items have lead times measured in months.

Funding, started early

Medicaid waivers at Medicaid.gov carry waiting lists, and a waiting list is the reason to apply before the need is acute. Our funding guide covers the other routes.

Equipment loan programs

For a condition where equipment is outgrown in months rather than years, loan closets and ALS-specific reuse programs are frequently better than purchasing.

They also take equipment back, which matters to families who do not want a garage full of reminders afterward. Our used equipment guide covers where things should go.

Ask for the whole picture at once

Rather than solving each problem as it arrives, ask the clinic team to map what is likely over the next year and plan the house against that.

It is a harder conversation and it produces far better decisions than reacting monthly. Our evaluation guide covers the building side, free and with no obligation.